ByteBridge

Exciting News

Lecture Hall AV Upgrade at a Private Osteopathic Medical School

  1. Location: Blacksburg, US

  2. Project Timeline: 2024 – 2025 

  3. Brands: 

Case Study Summary

  • Engineered long-life AV infrastructure to support future upgrades without heavy renovation.

Lecture Hall AV Upgrade at a Private Osteopathic Medical School
Edit Content