From Pilot to Production: Liquid-Cooled Load Bank Rentals That Keep HPC Projects on Schedule
The 90-Day Trap Nobody Talks About Hyperion Research’s 2024 benchmark shows 42 % of new HPC installations miss their go-live target, and thermal validation is the single biggest choke point. With AI racks already pushing 100 kW per cabinet—and next-gen silicon rumored to hit 1 kW per GPU—legacy air-cooled load banks simply cannot reproduce the […]